Welcome to ECBAY
Rubber recycling plant
Rubber recycling plant

No.

The system name

1

rotatable reactor

2

automatic sealing slag discharge system

3

cover

4

oil separator

5

cooling system(condensor)

6

light oil tank

7

heavy oil tank

8

water sealing tank

9

cooling tower

10

fan

11

speed reducer

12

dust remove system

13

waste gas burning system

14

blowers

15

electric cabinet

16

the pressure automatic alarm

17

water pump

18

oil pump

The warranty and after-service:

1We will supply the foundation drawings to buyer after get deposit.

2The delivery time is 15-20days after get deposit.

3We will send engineers to install the machine when the machine reach buyer's factory. The engineer will installation,guide the machine, then training the workers for buyer. Then will supply the catalyst formula to buyers, the buyer can buy it at your local.

4We warranty the complete machine one year, we will maintenance all it life.When the machine can not running normal, the buyer can call us, we will help buyer repair it by call, if can not solve, we will send engineer to buyer's factory at the shortest time.if need change parts,the buyer can buy it from our factory.   

Ads by Google


About Us | Contact Us | Help | Terms & Conditions
Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.