Welcome to ECBAY
refrigeration compressor (heat exchanger, wire on tube evaporator)
refrigeration compressor (heat exchanger, wire on tube evaporator)

heat exchange part, conform to ROHS CERTIFICATE refrigeration part evaporator condenser

Specifications(wire on tube evaporator)
Raw material1) Rolling welded steel pipe: ? 8 ×0.71 , with wall thickness 0.72) low carbon steel wire ?1.4 ∼ ?1.63) Bracket: Steel plate(SPCC) thickness: 0.6 ∼ 0.9
Structure

Structure 1: evaporator for single temperature control system (Single-capillary evaporator)Structure 2: evaporator for double temperature control system (Double-capillary evaporator)Structure 3: evaporator for three way temperature control system (Three-capillary evaporator)

Key process

Tube bending, Welding, Mono shelf assemble, Assembly welding, Leakage test, Cleaning, Coating, Inspection, Packing

Technical standards

Wire pitch: ≥ 5 , can produce according to the drawing or sample supplied by clients, also can help the clients design and produce different evaporators.

Performance

1 Surface treated with electrophoresis or powder painting to prevent the corrosion2 Inner cleanness can meet the requirements of R134a & CFC cooling system. 3 Can satisfy the cooling capability requirements.

Capacity

3.0million sets per year (9000 sets per day).

R134a Cooling System Tube Inside Standards

Linear measure

≤ 0.004L

Verticality

≤ 0.047B 2

Residual moisture

≤ 5 /100cm3

Residual impurity

≤ 10 /100cm3

Residual mineral oil

≤ 100 /100cm3

Residual chlorine

≤ 5vloppm

Residual paraffin

≤ 3 /

Specification of E-coating
Coating thickness

  thickness of Anodic electrophoresis coating 18 ∼ 22 μ m;  thickness of cathodic electrophoresis coating 15 ∼ 20 μ m;  thickness of wire-tube evaporator powder coating:60 ∼ 300μ m

Hardness of coating

≥ 2H

Impact of coating

50cm?kg/cm impact, no crack

Adhesion of coating

≥two grade

Flexibility of coating

Around R=3D bend 180?, no crack or no fall off

Color tolerance of powder painting

E ≤ 1.5

Corrosion resistant(Salt spray GB2423)

  Anodic electrophoresis coating ≥24h;  Cathodic electrophoresis coating ≥72h;  Powder paining≥200h

refrigeration compressor (heat exchanger, wire on tube evaporator)

Ads by Google


About Us | Contact Us | Help | Terms & Conditions
Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.