Steel Ceiling Channel Roll Forming : 1,high quality,and automautic 2,easy operation 3,low price Steel Ceiling Channel Roll Forming 1. The Chart of Process Flow Decoiling--active feeding--roll forming--measuring length--pressing--cutting to length--product to stand2. Main Equipment Decoiler, main forming machine, hydraulic pressing, hydraulic cutting, product stand, hydraulic system, electric system. 3. Technical Parameters
1.Profile | 1.1 Coil material color Sheet, galvanized sheet 1.2 Coil material thickness1.5mm- 3mm |
2. Process flow | Decoiling--feeding---forming---cutting---production |
3. Manual decoiler | 3.1 Material coil inner diameter450mm-700mm 3.2 .Max coil width:600mm 3.3 Carrying capacity 1.5T |
4 Forming device | 4.1 Shaft material: 45# steel, outer diameter 80mm 4.2 Roller material: bearing steel 4.3 11 pairs of forming rollers 4.4 transport by gear 4.5Forming spee 10m/min 4.6Main motor power 11kw 4.7Voltage:380v,50Hz |
5. Hydraulic Cutting device | 5.1 Hydraulic Statio 1set 5.2 With hydraulic station, motor 4KW 5.3Hydraulic cutter 5.4Blade, puncher and mold material: G12 steel with quenched treated 60-62°C 5.5Cutting system: advanced hydraulic drive, automatic cutting after forming, no distorting or wasting, high level safety factor. |
6.Controlling Device | 6.1 Screen: 5.7 inch Taida screen 6.2 PLC: Panasonic 6.3 Automatic length measurement 6.4 Automatic quantity measurement 6.5 Computer is used to control length and quantity. Machine will automatically cut to length and stop when required quantity is achieved 6.6 Length inaccuracy can be amended easily |
7. Spare parts | 8.1 Easy damaged parts: conk 2 pcs, fuse-link 4 pcs 8.2 Rubber mat 1 pcs; 8.3 Bolt spanner 1 pcs
|
8.Payment and terms | Payment: 30% T/T in advance and balance 70% after inspection confirmation before shipment. Delivery: within 60 working days after receipt of deposit |
9. Warranty | 1. One year, and we will provide the technical support for the whole life. 2. Trainning: the buyer should charge of visa, return ticket, food and accommodation overseas and USD50/person/day for salary. 3. Need one technicians 4. Training time: one week (contains the time of installation and adjustment) |
Steel Ceiling Channel Roll Forming