Steel conduit 1.Manufacturer Price 2.Heavy PG&HTG Surface Pipe 3.BSI Approval Pipe
Steel conduit
1.The steel pipe is formed with high quality welded tube and advanced galvanization technology and equipment. The galvanization layer is equally galvanized and smooth finished free from black spots and bubbles, strong corrosion resistance. Protect the wires perfectly in severe conditions like humidity, strong corronsion environment.
MOTTO: Cable Safeguard Conduit
Advantages:
Zero spur, Cable safe ConduitPlain Seam, bendableHigh Zinc CoatingBSI,UL,TUV,GMC,ISO9001EMT (Electrical Metallic Tube) UL797 ANSI C80.3
Nominal Diameter | Outside Diameter | Wall Thickness | Length[ft(±1/4in)][mm(±6mm)] | Minimum acceptable weight | ||||
Trade Size | Metric Designator | in.(mm) | Tolerance | in.(mm) | Tolerance | in.(mm) | lbs/ft | kg/m |
1/2" | 16 | 0.706(17.93) | ±0.13mm | 0.042(1.07) | +/-5%
| 10'(3050) | 0.285 | 0.424 |
3/4" | 21 | 0.922(23.42) | ±0.13mm | 0.049(1.24) | 10'(3050) | 0.435 | 0.647 | |
1" | 27 | 1.163(29.54) | ±0.13mm | 0.057(1.45) | 10'(3050) | 0.640 | 0.952 | |
1-1/4" | 35 | 1.510(38.35) | ±0.13mm | 0.065(1.65) | 10'(3050) | 0.950 | 1.414 | |
1-1/2" | 41 | 1.740(44.20) | ±0.13mm | 0.065(1.65) | 10'(3050) | 1.100 | 1.637 | |
2" | 53 | 2.197(55.80) | ±0.13mm | 0.065(1.65) | 10'(3050) | 1.400 | 2.083 | |
2-1/2" | 63 | 2.875(73.03) | ±0.25mm | 0.072(1.83) | 10'(3050) | 2.050 | 3.051 | |
3" | 78 | 3.500(88.90) | ±0.38mm | 0.072(1.83) | 10'(3050) | 2.500 | 3.720 | |
3-1/2" | 91 | 4.000(101.60) | ±0.50mm | 0.083(2.11) | 10'(3050) | 3.250 | 4.837 | |
4" | 103 | 4.500(114.30) | ±0.50mm | 0.083(2.11) | 10'(3050) | 3.700 | 5.506 |
Production Line
Comparison
YITONG Conduit VS Regular Conduit
CERTIFICATES
PACKING DETAILS
Packing bag: White plastic bag, protect well the pipe from the wet air.
Packing way: Hex packing 100pcs/bag or 10pcs/budle, 10bundles/bag round packing
Packing string: Strong Plastic string for easy load and unload the goods, will put in the middle.
MOQ: 20tons or one 20” container
Delivery: 15-25 working days
Payment: 30%deposit TT in advance, the balance need to pay before delivery.
Sample EMT